REDWOOD SYNDICATE · NVIDIA BLACKWELL ULTRA
NVIDIA B300 AI INFRASTRUCTURE CONFIGURATOR

Configure Your B300 Infrastructure.

Configure your B300 deployment, understand the infrastructure requirement and model the commercial economics before engaging Redwood Syndicate for deployment.

GPU Configuration
8 ×
Blackwell Ultra GPUs / system
Total GPU Memory
2.1 TB
/ system
NVLink
14.4 TB/s
Aggregate bandwidth
Networking
800 Gb/s
Maximum published
System Power
~14 kW
Published system power
B300 DEPLOYMENT PLANNER

Configure Your AI Infrastructure.

Change the assumptions below to see how B300 system count translates into GPU capacity, rack requirements, power, compute capacity and indicative operating economics.

Infrastructure Assumptions
01 — INFRASTRUCTURE
Infrastructure
Default hardware assumptions are based on NVIDIA’s published DGX B300 specifications. Facility-level requirements vary by deployment.
02 — ENERGY
Energy
03 — UTILIZATION & REVENUE
Utilization & Revenue
Leave GPU-hour price at zero if you only want to model physical infrastructure requirements.
04 — OPERATING COSTS
Operating Costs
05 — INVESTMENT
Investment
Configuration Output
Your B300 Infrastructure 1 System
B300 Systems 1
Total GPUs 8
GPU Memory 2.1 TB
Rack Space 10U
IT Power 14 kW
Facility Power 18.2 kW
Monthly Energy 13,104 kWh
GPU Capacity / Month 4,032
Monthly Revenue —
Monthly OPEX —
Monthly EBITDA —
EBITDA Margin —
Total CAPEX —
Annual EBITDA —
Simple Payback —
Financed Amount —
GPU Utilization 70%
0% 70% 100%
This calculator provides preliminary planning estimates. Actual hardware pricing, power consumption, facility requirements, taxes, financing, utilization and operating costs must be validated for the specific project.
NVIDIA DGX B300

Technical Foundation.

NVIDIA’s published DGX B300 specifications provide the hardware baseline used by this planner.

GPU
8 × Blackwell Ultra SXM
GPU Memory
2.1 TB*
FP4 Performance
144 PFLOPS sparse
FP8 Performance
72 PFLOPS
NVLink
14.4 TB/s
Networking
Up to 800 Gb/s
Storage
NVMe
Rack
10U
System Power
~14 kW
CPU
Intel Xeon 6776P
DPU
BlueField-3
Software
NVIDIA AI Enterprise
* NVIDIA’s product page lists 2.1 TB total GPU memory. NVIDIA’s user guide provides a hardware-level 8 × 288 GB description. Product configurations and specifications should be confirmed at procurement.
DEPLOYMENT ARCHITECTURE

The B300 Is the Compute Layer.

Redwood evaluates the infrastructure surrounding the compute system to determine whether the proposed deployment can work technically and economically.

01 — POWER

Electrical Infrastructure

Power capacity, distribution, redundancy and facility-level requirements.

02 — COOLING

Thermal Infrastructure

Evaluate rack density and cooling architecture for the proposed deployment.

03 — NETWORK

AI Fabric

High-speed compute networking, storage fabric and external connectivity.

04 — STORAGE

Data Layer

NVMe, data pipelines and storage performance for AI workloads.

05 — FACILITY

Data Centre

Rack space, power, cooling, security and operational environment.

06 — SOFTWARE

AI Software

Operating system, orchestration and AI software environment.

07 — OPERATIONS

Managed Infrastructure

Monitoring, support, lifecycle and operational requirements.

08 — FINANCE

Capital Strategy

CAPEX, financing, utilization and commercial deployment economics.

DEPLOYMENT OPTIONS

How Do You Want to Deploy B300?

OPTION 01

Dedicated Enterprise

Dedicated B300 infrastructure for private, enterprise and mission-critical AI workloads.

OPTION 02

GPU Colocation

Deploy B300 infrastructure inside a suitable third-party data-centre environment.

OPTION 03

GPU-as-a-Service

Build a commercial AI compute platform and monetize GPU capacity.

NEXT STEP

Your Configuration Is Only the Beginning.

Use the calculator to establish your preliminary infrastructure requirement. Then let Redwood Syndicate help translate it into a deployment strategy.

B300 DEPLOYMENT ENQUIRY

Build the Infrastructure Around Your AI Workload.

Share your requirements and Redwood Syndicate can evaluate the infrastructure, deployment and commercial pathway.

  • B300 system requirements
  • Power and cooling requirements
  • Data centre / colocation
  • GPU-as-a-Service deployment
  • Financing and capital requirements
B300 DEPLOYMENT ENQUIRY
REDWOOD SYNDICATE · NVIDIA BLACKWELL ULTRA

Build the B300 Infrastructure Around the Workload.

Configure your B300 requirement, understand the infrastructure economics and move toward the appropriate deployment strategy.