AI Infrastructure Decision Studio

Configure your business model, select funding and forecast frequency, then review the investment decision.

MODELLING WORKSPACEv2.2.0
PROJECT FOUNDATION · SET ONCE

Define your investment project

Enter all monetary assumptions in the chosen currency. No automatic FX conversion or country-specific tax assumptions are applied.

00 / INVESTMENT COMMAND CENTRE

Your project portfolio, in one place

Save scenarios, compare investment cases, stress-test key assumptions and prepare an investment committee brief.

Private browser workspace
INSTITUTIONAL MODEL · 10-YEAR BASE CASE

Integrated project financial model

Run the active GPU fleet through annual revenue, EBITDA, depreciation, tax, working capital, maintenance and refresh CapEx, DSCR-sculpted debt service, DSRA, refinancing, covenant tests, LLCR screening and a reconciled indicative balance-sheet bridge.

Project IRR—
Equity IRR—
Minimum DSCR—
LLCR screening—
Project NPV—
Sponsor equity—
YearRevenueEBITDATaxCFADSDebt serviceDSCRDSRARefinanceRefresh CapExClosing debtAssetsLiabilitiesEquity bridgeBS checkEquity cash flow
Run the integrated model to build the annual financial schedule.
Model outputs are screening estimates. Review the qualifications before relying on them.
Stress caseProject IRREquity IRRMinimum DSCRProject NPV
Run the base case before running sensitivities.
LATEST SAVED MODEL SNAPSHOT

Investment dashboard

Headline outputs captured when you save a scenario. Run each relevant model before saving to refresh these figures.

GPU annual EBITDA—
Data-centre EBITDA—
Project equity IRR—
Fleet project IRR—
Save a scenario after running the models to populate this dashboard.
SCENARIO LIBRARY

Build a decision history

Save the current model inputs across the modelling workspaces. Resume a scenario later or compare saved cases side by side.

Scenarios are stored only in this browser on this device. Do not use shared devices for confidential assumptions.
PORTFOLIO COMPARISON

Compare saved scenarios

Compare the three most recently saved cases and generate a side-by-side assumption and output comparison.

ScenarioCurrencyGPU countGPU rate / hrGPU annual EBITDAProject equity IRRFleet IRRFleet CapExSaved
Save at least two scenarios to compare them.
SENSITIVITY STUDIO

Understand what moves returns

Run a controlled screening around your selected investment case. Sensitivity outputs are indicative, assume 75% of monthly GPU operating cost is power/hosting for the power-cost shock, and should be recalculated in the relevant detailed model before decisions.

CaseRevenue impactCost impactIndicative EBITDA impact
Run sensitivity after saving a scenario.
INVESTMENT COMMITTEE

Prepare an investment brief

Generate a structured decision brief with project assumptions, selected scenario, comparison notes, risk prompts and model qualifications.

The IC brief is a screening document, not an offer, valuation opinion or credit approval.
01 / UNIT ECONOMICS

GPU Infrastructure Economics

Indicative operating preview. The server-side engine also supports owned, leased and asset-light cases.

Editable assumptions
Monthly revenue—730 hours/month before availability adjustment
Monthly operating EBITDA—Before financing, tax & depreciation
Annualised EBITDA—Run-rate estimate
Simple payback—Not an IRR or investment return

Connecting to server-side calculation engine…

Connecting to server-side calculation engine…

Model boundary

This page remains a preview interface. The v0.2 server engine provides monthly GPU schedules and financing metrics; full financial schedules and audited model validation remain under development.

02 / PROJECT ECONOMICS

Data Centre Project Economics

Indicative annual operating schedule with occupancy ramp and explicit power recovery.

Five-year view
Total development CapEx—IT MW × assumed CapEx / MW
Stabilised annual revenue—Excludes pass-through power
Stabilised annual EBITDA—Before debt, tax & depreciation
Simple project payback—CapEx / stabilised EBITDA
YearOccupancyRevenueEBITDA

Connecting to server-side calculation engine…

Model boundary

The v0.2 engine models occupancy, colocation revenue and power recovery. Integrated construction funding, tax, depreciation, debt, DSCR and three-statement schedules remain future release gates.

04 / DEVELOPMENT & CAPITAL STRUCTURE

Data Centre Project Finance

Build a monthly funding and operating case. Model customer cash commitments, phased commissioning, construction debt, IDC and lender returns.

Investment & lender readiness

1. Project & construction

Optional: one comma-separated weight per construction month. Leave blank for equal monthly drawdowns.

2. Customer contracts & collections

3. Site, utility & development costs

4. Customer reservation deposits

5. Debt & equity

6. Operating & tax assumptions

Project CapEx—Before capitalised interest
Debt at commissioning—Includes construction IDC
Customer cash collected—NRC + deposits + advances
Sponsor equity need—Indicative construction funding gap
Project IRR—Unlevered indicative return
Equity IRR—After debt service
Minimum DSCR—During periods with debt service
LLCR—CFADS PV / opening debt
Total project uses—CapEx + deposits + lender fee + DSRA
Reservation deposits—Refundable and non-refundable split
DSRA target—Indicative reserve requirement
Sponsor equity gap—Balancing funding requirement

Sources & uses — indicative funding bridge

Source / useClassificationAmount
Run the model to generate the funding bridge.
Customer cash is not all revenue

NRC is a non-recurring charge. Refundable security deposits remain liabilities. Advance rent is deferred and recognized as service is delivered. The model shows these cash streams separately to avoid overstating EBITDA.

MonthLive MWOccupancyRevenueEBITDACapExDebt drawCFADSDebt serviceDSCR
Run the model to generate the monthly schedule.
Ready to calculate. Inputs are illustrative and editable.
Model qualification

Outputs are decision-support estimates. Confirm customer contract terms, tax, debt sizing, engineering, construction drawdowns and accounting treatment before lender or investment committee use.

03 / CAPACITY ENGINEERING

AI Infrastructure Capacity Planner

Server-system power basis with rack power constraints.

Planning estimate
GPU count—Requested deployment
Estimated racks—Power and server count constrained
IT load—Full server-system load
Facility power design—IT load × PUE × headroom

Connecting to server-side calculation engine…

Engineering qualification

Use OEM system power, not GPU board TDP. Validate U-space, rack weight, floor loading, network topology, electrical redundancy, cooling and utility capacity with the OEM and MEP team.

05 / STRATEGY & CAPITAL ALLOCATION

Infrastructure Strategy & Investment Comparator

Compare GPU ownership, leasing, partner-funded models, owned data centres and colocation on a common workload basis.

Global · Hybrid pricing · 7 strategies

Hardware & workload

Compares each generation with a valid Redwood benchmark; the selected model can use your vendor quote.
Enter a vendor quote in the selected reporting currency to override the Redwood benchmark. For rack systems, use an accelerator-equivalent price.

Facility & operating assumptions

Power consumption as a share of rated system draw; not billable GPU utilisation.

Financing & returns

Annual GPU revenue—Common workload basis
Calculated IT load—GPU count × system power
Top model equity IRR—Indicative strategy ranking
Lowest initial investment—Among compared structures
Hybrid pricing: user quotation overrides Redwood-administered indicative benchmark. No benchmark is assumed if one has not been configured.
HardwareStrategyInitial investmentEquityAnnual EBITDAEBITDA / investmentProject IRREquity IRRPayback
Run comparison to generate results.
Model boundary

Strategy screening only. Compare results using consistent contracts, service levels, financing terms, taxes, useful life and refresh assumptions. Detailed project-finance and engineering validation remain separate.

06 / FLEET LIFECYCLE & CAPITAL RENEWAL

Multi-Generation GPU Fleet & Refresh Economics

Build a mixed fleet, phase deployment, model generation-specific pricing and plan replacement cycles across the investment horizon.

Multi-generation · 1–15 years

Fleet composition

Add up to eight generations. Enter actual or indicative prices; no GPU price is silently assumed.

Lifecycle, operations & funding

Total GPU fleet—GPU-equivalent units
Initial GPU CapEx—Phased acquisition cost
Project IRR—Pre-tax screening estimate
Cumulative refresh CapEx—Replacement cycles in horizon
YearActive GPUsRevenueEBITDADepreciationRefresh CapExDebt serviceEquity cash flow
Configure fleet and run the lifecycle model.
Model boundary

Pre-tax lifecycle screening. Detailed tax, working capital, debt sculpting, DSRA, maintenance, refresh downtime and disposal accounting are not included.

07 / MONTHLY INSTITUTIONAL FINANCING

Monthly multi-tranche financing & linked statements

Model up to 180 months, five ranked debt tranches, construction drawdowns, capitalised interest, repayment waterfalls, DSRA, cash sweep, tax, working capital and a monthly balance-sheet bridge.

Monthly · up to 15 years

Contract-backed revenue and risk

Reserved capacity is excluded from spot sales. Advance received in month one; full prepaid term must fit the projection. Simulations are illustrative, not calibrated probabilities.

Individual customer agreements

Add agreements to override uniform contract terms. Cohort numbers follow fleet row order. Advances received in month one. Default releases capacity immediately; unused advance refund percentage applies on default, and all unused advances are refunded at expiry.

Debt facility term sheets

Edit the example to match the proposed term sheet. Amounts are percentages of initial GPU CapEx; priorities are paid in ascending order. Draw windows must fall within construction.

Advanced JSON configuration
Project IRR—
Equity IRR—
Minimum DSCR—
Ending debt—
DSRA balance—
Balance-sheet check—
MonthRevenueEBITDATaxCFADSDrawsInterestPrincipalDSCRDSRACashDebtAssetsEquityBS check
Run the monthly financing model to generate the schedule.
Model boundary and lender/legal review notes will appear here.
08 / INVESTMENT COMMITTEE

Investment closure

Review your investment case, reconcile assumptions and prepare the final decision package.

01   Configure02   Calculate03   Review & export
01

Define the investment case

Name the project and select supporting evidence.

Primary financial case · Required

Monthly institutional finance

Integrated cash flows, customer contracts, financing and risk. Supporting cases are not additive.
Supporting analyses
Unified investment scope and assumptions

Stage 03 engineering is resized to the selected fleet. Stage 07 tranches finance the consolidated initial investment. Stage 04 budget can be used instead of Stage 02 costs; Stage 04 financing and Stage 05 ownership alternatives are not added. Owned facility assumes dedicated GPU use, not external colocation sales.

02 · Calculate the investment case

Review assumptions in the selected workspaces before building.

03 · Investment decision package

Available after a successful calculation and enterprise verification.

Excel and PDF will be sent to your verified corporate email. No PDF opening password required.

AI Infrastructure Investment Calculator

Redwood Syndicate's AI Infrastructure Investment Decision Studio helps enterprises, GPU cloud providers, data centre developers and investors model infrastructure economics and financing. Select the modules relevant to your investment, review the assumptions and evaluate the financial results.

GPUaaS profitability and GPU comparison

Evaluate GPU hourly pricing, utilisation, acquisition costs, hosting expenses, mixed GPU fleets and independent GPU investment alternatives.

Data centre and colocation financial modelling

Model hosted GPU infrastructure, owned data centres, standalone colocation and hybrid revenue, with capacity and capital expenditure assumptions.

Infrastructure financing and investment returns

Compare own capital and financed deals using project IRR, equity IRR, NPV, DSCR, break-even and capital payback.

Yearly cash flows and institutional reporting

Review monthly or annual forecasts, profit and loss, balance sheets, cash flows, sensitivity and optional Monte Carlo risk analysis. Receive Excel and PDF reports after corporate email verification.

Frequently asked questions

Can I compare different GPUs or financing structures?

Yes. Select GPU comparison for independent GPU cases, or change the funding module and assumptions to evaluate debt and equity structures. Alternative cases are not added together.

Can I model an owned data centre or a colocation business?

Yes. Choose owned infrastructure, standalone colocation or a supported hybrid GPUaaS and colocation model.

Are monthly and yearly forecasts consistent?

Both views use the same monthly financial engine. Annual flows are summed and balance sheet values are taken at year end.

How do I receive my investment reports?

Calculate your investment case and select Email my investment reports. Verify your corporate email and complete your enterprise profile. The selected case's Excel and PDF reports are sent to the verified address.

Free decision-support modelling. Results depend on your assumptions and are not a guarantee of investment performance.

© 2026 Redwood SyndicateDecision-support estimates · Verify assumptions before investment decisionsDiscuss a project